Registration of using pressure container

[2008-12-23 16:54:10]

Processing Authority: Special Equipment Supervising Department of Shanghai Quality and Technical Supervision Bureau

Application Formality:

1. Registration of new pressure container (not used yet)

(1) Product eligible certificate;

(2) Product quality certificate;

(3) Drawings of finished product;

(4) Quality Safety Supervising Certificate of Product Manufacturing issued by relevant authority;

(5) Imported pressure container should have Safety Performance Supervising Reports on Boiler and Pressure Container of People's Republic of China, audited and chopped by Shanghai municipal safety supervising institution of boiler and pressure container;

(6) 2 copies of Registration Form of Using Pressure Container (filled).

2. Registration of pressure container on duty

(1) Testing report and records of the pressure container on duty;

(2) 2 copies of Registration Form of Using Pressure Container (filled);

(3) Testing reports on safety accessories;

(4) Rules on safety operation.

Processing Procedures:

1. The applicant makes application to the processing authority with relevant documents;

2. Audit the documents;

3. Enrolling, registering, and certificating;

Charge Standard & Basis:

Standard: Certificate of Using: RMB 5 per unit

Registration Plate: RMB 2 per unit

Basis: Notice on Verifying Administration Charging Items and Standards of Shanghai Labor System by Shanghai Pricing Bureau and Shanghai Finance Bureau (Hu Jia She [1992] No. 177)

Processing Address: 10th Floor, No. 1227 Chang-Le Road



Processing Basis:

1. Interim Regulations on Safety Supervising of Boiler and Pressure Container

2. Rules on Safety Technology Supervising of Pressure Container

3. Registration Regulations of Using Pressure Container

4. Rules on Safety Supervising of Liquid Gas, Vehicles and Tank Cars

5. Opinions On Implementing Registration Regulation of Using Pressure Container Promulgated by the Ministry of Labor and Social Security

Contact Tel: 54046131、54045500×2004

Processing Time: Tuesday and Thursday 8:30-16:30

Time Limit for Processing: Within 30 working days for those who meet the requirements

Qualified Application Subject:

Pressure container falling into the administrating scope of Registration Regulation of Using Pressure Container, and installed in Shanghai.

Source: 上海市人民政府