Qualification Examining and Certificating of boiler welder, pressure container w

[2008-12-23 16:54:10]

Processing Authority: Special Equipment Supervising Department of Shanghai Quality and Technical Supervision Bureau

Application Formality:

1. welders who are engaged in the manufacturing, installing, repairing, and reconstructing of boiler, pressure container, and pressure pipeline;

2. With an education background equal or beyond junior high school, healthy, and be able to take the weld task independently;

3. welder who applying for the examination shall get the approval from the examination committee.

Processing Procedures:

1. applying to the welder examination committee for the qualification examination

2. the committee assesses the welders and constitutes training plan

3. the committee carry through basic knowledge training

4. the committee carry through examinations on basic knowledge

5. the committee will organize practice skills training to those who pass the knowledge examination

6. the committee takes examinations on the practice skills

7. the committee shall report the examination scores to Special Equipment Supervising Department of Shanghai Quality and Technical Supervision Bureau and make files

8. Special Equipment Supervising Department of Shanghai Quality and Technical Supervision Bureau will issue certificates to the eligible welders after auditing.

Charging Standard & Basis:

Standard: RMB 4 for registration and issue of welder certificate

Basis: Notice on Verifying Administration Charging Items and Standards of Shanghai Labor System by Shanghai Pricing Bureau and Shanghai Finance Bureau (Hu Jia She [1992] No. 177)

Processing Address: Room 1006, No. 1227 Chang-Le Road

Processing Basis:

1. Interim Regulations on the Safety Supervising of Boiler Pressure Container

2. Regulations on Safety Administration and Supervising of Pressure Pipelines

Contact Tel: 54046131 54045500-2004

Processing Time: Tuesday and Thursday: 8:30-16:30

Time Limit for Processing: The processing authorities shall finish the approving and certificating procedures within 10 days after accepting the documents submitted by the welder examination committee.

Qualified Application Subject:

1. welders of the organizations which have already acquired the qualification of manufacturing, installing, repairing, and reconstructing boiler, pressure container, and pressure pipeline.

2. welders of the organizations which have applied and on the process for the qualification of manufacturing, installing, repairing, and reconstructing boiler, pressure container, and pressure pipeline.